ISO 9001  ·  AS9100  ·  Engineering Visibility. Delivering Certainty. RFQ: quotes@alliedmeridiangroup.com
Engineering-driven supply chain solutions

Engineering Visibility. Delivering Certainty.

Allied Meridian Group engineers the answer to a physical supply chain problem, sources it globally, holds it as capital, positions it geographically, and delivers it with instrumented visibility. The product is the last step, not the first.

AMG warehouse — palletized corrugated inventory
4 Locations
550K Sq ft under roof
48 hr Standard order release
3 Day-one delivery regions

Seven functions. One operating system.

AMG integrates engineering, sourcing, inventory, warehousing, logistics, and technology into a single operating system called AMG Pulse — so the customer sees one position, one commitment, and one accountable party.

Packaging engineering — structural design sample
01 / Engineering

Structural design & testing

Board grade selection, structural CAD, sample builds, and drop/compression validation before a single skid ships.

Containerboard roll stock — mill sourcing
02 / Supply chain

Sourcing & program management

Multi-mill sourcing, indexed pricing visibility, and managed inventory programs sized to your release schedule.

Racked warehouse aisle — 3PL storage
03 / 3PL

Storage & distribution

Dedicated and shared warehousing, pick/pack, kitting, and outbound freight across a four-facility footprint.

Export crate with military-style markings
Platform roadmap

Built for operations that cannot afford to be wrong.

The Government division operates under a separate compliance architecture from the commercial business. It is not a sales channel bolted onto the commercial operation — it is a different company operating inside the same walls, governed that way from day one.

The position no one else occupies

Engineered specification, held inventory, owned footprint, and instrumented visibility — under one accountable party.

Competitor type Their claim AMG counter
National distributor Scale and price Adds engineering
Regional distributor Service, access Adds systems
Asset-light 3PL Flexibility Adds position
Brokers Speed Adds accountability
Manufacturer direct Cost Adds integration
Quality system
ISO 9001 AS9100 [ITAR — confirm] [CAGE code — confirm]
Capability / Engineering

Packaging engineered against the load, the lane, and the line.

Design decisions get made once, documented, and validated — then held as a controlled spec for every reorder.

Stage 01

Discovery

Conducted on site. The engineer observes the actual line, handling, and storage environment. Direct observation produces specifications that perform in service.

Output: Application requirements doc
Stage 02

Analysis

Every application assessed against a standard failure taxonomy: compression, vibration, drop, moisture, temperature, chemical, abrasion, and handling. Non-applicable modes are documented, not left silent.

Output: Failure mode assessment
Stage 03

Design

Drawings state dimensions, tolerances, materials, finishes, and performance criteria explicitly. Complete tolerancing is the standard on every released specification.

Output: Drawing and spec
Stage 04

Validation

Physical testing against the protocol defined in analysis. Where AMG does not test internally, testing is placed with an accredited laboratory and the report is retained.

Output: Test protocol and results
Stage 05

Release

The released specification is the controlled record. Manufacturing, purchasing, and quality all reference the same document. One specification, one place, one revision history.

Output: Controlled spec in Pulse

What we design

Regular slotted containers & die-cut cartons Heavy-duty triple-wall & bulk bins Interior fitments, partitions, and foam-in-place Returnable and reusable dunnage Export crating and long-term storage packs

What you get back

Dimensioned structural drawing Material and board grade specification Test report against the referenced standard Cube and freight impact summary Landed cost per unit shipped
Compression test — corrugated box in test lab
Capability / Supply chain

Multi-mill sourcing with one accountable owner.

Independence means we buy where the grade, lead time, and index actually favor your program — not where a parent company needs volume.

Sourcing & qualification

Mill and converter qualification on quality system, capacity, and geography. Dual-source strategy on every critical part number so a single outage doesn't stop your line.

Managed inventory programs

Min/max, consignment, and scheduled-release programs held in AMG facilities. You order against a release schedule; we hold the position and the risk.

Cost & index transparency

Containerboard index movement, freight, and conversion shown as separate lines. Price changes are explained before they appear on an invoice.

Program management

A named program manager, a quarterly business review, and one escalation path — not a rotating queue of account reps.

The exception standard

AMG communicates first, with the recovery plan attached. Notifying a customer before they encounter an issue is the clearest demonstration of operational control.

HourAction
0System flags missed milestone
1Owner confirms and sizes impact
2Recovery options modeled
4Customer notified — with the recovery plan, not just the problem
24Recovery underway and confirmed
CloseRoot cause recorded — exceptions without a root cause recur
Program intake

Send a part list, get a sourcing read in five business days.

Current spec, annual usage, and release pattern is enough to start. We come back with a qualified source plan, lead time, and a landed cost comparison that separates supplier cost, freight, duty, and carrying cost.

Supplier scorecard

Every production supplier carries a running score across five dimensions, shared at the quarterly review. A supplier who can see the number and the calculation behind it can act on it.

DimensionMeasured byWeight
QualityNonconformance rate30%
DeliveryOn-time to promise30%
ResponsivenessTime to answer15%
CostLanded cost trend20%
SustainabilityDocumentation current5%
BandStatus
90 and abovePreferred — growth eligible
75 to 89Approved — standard volume
60 to 74Improvement plan required
Below 60Volume reduced — requalify
Capability / Third-party logistics

Storage, kitting, and distribution on your release schedule.

Four facilities, WMS-managed lot and location control, and outbound freight execution — for packaging programs and for the finished goods that travel in them.

Reach truck in warehouse aisle — 3PL distribution

Warehousing

Dedicated space or shared racking, floor-stacked bulk, and climate-appropriate storage zones with cycle counting.

Pick, pack & kitting

Case and each picking, sub-assembly kitting, labeling, and light manufacturing under documented work instructions.

Inbound & receiving

Container devanning, ASN receipt, dimensional verification, and quarantine handling for nonconforming material.

Transportation

LTL, truckload, and dedicated runs through vetted carriers, with pool distribution between AMG facilities.

Systems & visibility

WMS inventory by lot and location, EDI and flat-file integration, and scheduled inventory and activity reporting.

Reverse logistics

Returnable dunnage cycling, rework, repack, and disposition reporting against your quality requirements.

Onboarding standard

Stage 01

Scoping

Volume and profile analysis — SKU count, order frequency, handling requirements, and peak profile.

Stage 02

Design

Layout, labor plan, and system configuration. Integrations mapped before build begins.

Stage 03

Pricing

Component rate card with each activity priced separately — storage, handling in, handling out, pick, value-added labor.

Stage 04

Pilot

Test volume with full SLA measurement before go-live. amgcop.com portal provisioned and verified.

Stage 05

Go live

Full volume, SLA active. Customer sees inventory from the first receipt — no account goes live before the portal is confirmed working.

Service levels

MetricStandardDefinition
Receiving to putawaySame business dayFrom dock close
Order cut to shipSame or next dayPer agreed cut time
Pick accuracy99.8%Lines correct on first pick
Inventory accuracy99.5%Count matched to system
Portal currencyNear real timeA-class items via amgcop.com

Service levels are contracted per program. Performance is reported through amgcop.com without being requested.

Platform / AMG Pulse

One system. One number. One picture.

AMG Pulse is the digital operating system of the company — the single place where transactions are recorded, inventory is tracked, performance is measured, and customers see their position. Engineering Visibility is a system, not a slogan.

AMG brand

The Common Operating Picture

AMG and the customer look at one picture. The inventory position an AMG planner sees is the position the customer's operations manager sees, at the same moment, from the same record. There is no AMG number and customer number to reconcile, because there is one number.

amgcop.com Customer portal

Your inventory on hand, on order, in transit. Work in process. Orders, shipments, documents, and OTIF performance. Specifications and revision history. Provisioned at go-live, visible from the first receipt.

Inventory — on hand, on order, in transit Orders — status, dates, documents Shipments — tracking and delivery proof Performance — OTIF, accuracy, quality Specifications — drawings and revisions
amgcop.live Internal operations

The internal address where AMG runs the business. Odoo ERP transactional core, Tableau analytics, warehouse execution, and AI services layer — all drawing from the same data warehouse as the customer portal.

ERP — Odoo transactional core WMS — directed warehouse execution Analytics — Tableau dashboards AI — exception detection, forecasting Integration — API and EDI

Without a COP vs. with a COP

Without Pulse Customer emails AMG to ask inventory position AMG queries system and builds a reply Reply lands hours later — a snapshot Two records now exist — reconciliation required Repeat for every question, every time
With AMG Pulse Customer opens amgcop.com The board reads live from the warehouse The number is current — no delay One record exists — nothing to reconcile The question is answered before it is asked

Stack architecture

Component Role Audience
Odoo ERP Transactional core Internal
WMS Directed warehouse execution Internal
Data warehouse Unified reporting store Internal + customer
Tableau Dashboards and analysis Internal + customer
amgcop.com Customer-facing portal Customer
AI services layer Forecasting, exception detection Internal
API / EDI Integration layer Partners + customers
Sector / Defense & military

Defense-grade packaging, storage, and distribution.

AMG is building its quality system, documentation controls, and facility security against aerospace and defense requirements — so preservation, packaging, and marking work can be qualified as the platform matures.

Current status: ISO 9001 and AS9100 quality system.
[ITAR registration, CAGE code, and DLA vendor status — confirm before publishing.]
Defense packaging

Preservation & packaging

Barrier materials, desiccant systems, cushioning, and method-of-preservation selection to MIL-STD-2073-1. AMG performs to the standard cited in the solicitation and substantiates conformance with retained documentation.

Marking & traceability

Container marking and UII label application to MIL-STD-129. Lot-level traceability from receipt through outbound shipment, retained in Pulse.

Long-term storage

Controlled storage with periodic inspection and re-preservation cycles for spares, tooling, and low-turn program inventory. Environmental testing to MIL-STD-810.

Standards we perform to

StandardScope
MIL-STD-2073-1Military packaging practice
MIL-STD-129Marking for shipment and storage
MIL-STD-810Environmental test methods
ASTM D3951Standard practice for commercial packaging
ATA 300Reusable container spec
NIST SP 800-171Protection of CUI

Compliance architecture

Contract termsFAR and DFARS flowdowns
InformationNIST SP 800-171 for CUI
CertificationCMMC at required level
SourcingBerry Amendment and TAA as applicable
ExportITAR and EAR screening
QualityISO 9001, AS9100

Qualification sequence

1
Registrations completeUEI, SAM.gov, CAGE code, NAICS / PSC mapping
2
Security baselineNIST baseline, CUI enclave stood up (3–6 months)
3
Quality system certifiedISO 9001 and AS9100 (6–12 months)
4
First prime subcontractBuilds past performance under real contract conditions
5
Past performance built2–3 years documented record
6
Direct award capabilityCMMC certified, vehicles held, 3+ years out

Have a requirement to review?

Send the spec and the quantity. We'll tell you plainly what we can qualify for today and what is on the roadmap.

Quality & compliance

One quality system, applied to every part number.

Specifications under revision control, documented inspection, and a closed-loop corrective action process — the same discipline whether the carton ships to a plant or a depot.

Certified

ISO 9001

Quality management system covering document control, supplier qualification, nonconformance handling, and continual improvement across all AMG facilities.

Certified

AS9100

Aerospace quality standard adding configuration management, risk management, counterfeit-part prevention, and first-article requirements to the base QMS.

How it shows up in your program

Spec control

Approved drawings and material specs held under revision; no substitution without written change approval.

Incoming inspection

Dimensional and construction verification on receipt, sampled to plan, with certificates retained on file.

Traceability

Lot and location control in the WMS, tying an outbound shipment back to a mill run and receipt date.

Corrective action

Formal CAR process with root cause, containment, and verification of effectiveness reported back to you.

Pending confirmation

[ITAR registration] · [CAGE code] · [SAM.gov] · [C-TPAT] · [FSC chain of custody] — remove or fill before launch.

Need certificates or a supplier questionnaire?

Certificates, quality manual excerpts, and completed supplier surveys are available on request from the quality team.

How OTIF is defined here

AMG uses the strict definition. A metric measured generously stops being useful for improvement.

ConditionRequirementAMG standard
On timeWithin committed window
In fullEvery line, full quantity
UndamagedNo damage claim filed
DocumentedPaperwork correct on first attempt
Counted atOrder level — one fail fails the whole orderStrict

Performance is reported to the customer through amgcop.com on a standing basis — not on request.

Network / Facilities

Four facilities, one inventory position.

Stock is visible and transferable across the network, so a shortage at one plant is solved from another building instead of a new mill order.

Photo — building exterior
{{ f.tag }}

{{ f.city }}

{{ f.blurb }}

{{ f.sqft }} {{ f.docks }}

Coverage map

Map graphic — four facilities with next-day freight radius
[confirm cities before we draw this]
About

Founded on twenty-five years of evidence.

Allied Meridian Group is an engineering-driven supply chain solutions company. AMG integrates engineering, commercialization, manufacturing, global sourcing, inventory management, warehousing, logistics, and technology into a single operating system. The founding team spent twenty-five years building and running distribution at national scale. One observation was durable: the customers who stayed longest were the ones whose problems were solved before they became problems — and those relationships were engineering relationships that happened to invoice as product.

The name

To eliminate uncertainty from complex supply chains.

Allied Latin alligare, "to bind together." Design, sourcing, and distribution bound into one accountable program.
Meridian Latin meridies, "midday" — the line of reference. The standard a supply chain is measured against.
Group A holding structure built to carry more than one line of business as the platform grows.

The seven principles — The AMG Way

These are not values. Values describe character. These describe method, and method is auditable. They govern every operating chapter of the business.

Principle 01

Engineering is the front door

Every customer relationship begins with a technical problem. No quotation is issued before a documented technical review exists.

Principle 02

Technology supports operations

Every technology initiative carries a named operational owner and a stated outcome before it is funded. Systems that don't get used don't count.

Principle 03

Purchasing manages relationships

Allocation goes to the supplier's preferred customer. AMG builds that position deliberately, in normal conditions, so it pays out when the market tightens.

Principle 04

Inventory is capital

Every unit on a rack is cash with a carrying cost. Inventory policy is set by documented service-level agreement and managed as a capital allocation decision.

Principle 05

Warehousing creates flexibility

The footprint is optionality — the ability to reposition, buffer, and take on programs a competitor without space must decline.

Principle 06

Logistics is customer experience

The delivery is the only part of AMG most of a customer's organization ever touches. Delivery performance is reported through Pulse without being requested.

Principle 07

Sales is engineering-first

Salespeople are qualified to diagnose and scope. Commercial terms are discussed after technical qualification. Compensation reflects solution complexity, not volume alone.

The commitment

The commitment outranks internal efficiency

Where two principles conflict, the commitment made to the customer outranks internal optimization. Where a commitment was set wrong, it is renegotiated openly rather than missed quietly.

When these conflict Resolution
Speed against spec review Review holds, always
Cost against service level Committed level holds
Freight cost against window Window holds
Inventory cost against fill Agreement governs
Volume against complexity Complexity is preferred
Vision

To become the supply chain organization that industrial and government buyers trust when the outcome cannot be in question.

Tested by a single question: when it absolutely had to be right, did you call us first?

Mission

To engineer, source, hold, and deliver the physical inputs that industrial and government operations depend on.

With complete visibility and without surprise.

Purpose

To eliminate uncertainty from complex supply chains.

When a decision is genuinely close, the resolving question is: which choice reduces uncertainty for the customer?

Core values

Values describe how people conduct themselves. Each is stated with its behavioral test — so it can be hired for, taught, and recognized.

Certainty

The customer is never left wondering. Every commitment has a date. Every open item has an owner.

Do you close the loop, every time?

Rigor

Assumptions are identified and tested. Numbers are verified against source. "I think" and "I confirmed" are different statements.

Do you check, or do you assume?

Ownership

The person who receives the problem owns it until it is resolved or formally transferred to a named person who accepts it.

Do you carry it to resolution?

Candor

Bad news travels at the speed of good news. Raising an issue early keeps it an operational event, resolvable with operational tools.

Do you deliver news early?

Craft

The work is done to a standard the person doing it is willing to be identified with — a weld, a spec sheet, a dashboard, or an email.

Would you sign your name to it?

Sustainability

Sustainability is an engineering discipline at AMG. Material reduction, right-sizing, and transport efficiency lower cost and lower impact simultaneously.

Right-sizing

The highest-leverage action. A package engineered to the actual product reduces material, increases units per trailer, and reduces damage — three benefits from one engineering decision.

Material selection

Recyclable and recycled-content materials selected at design. Suppliers provide material composition and recycled content documentation as a condition of qualification.

Cube efficiency

More units per trailer. Pallet pattern modeling at design reduces freight moves, fuel, and emissions per unit shipped.

Measurement

Material per unit, recycled content percentage, cube utilization, scrap rate, and waste diverted — tracked in Pulse and available to customers for their own sustainability reporting.

Leadership

{{ m.name }}
{{ m.name }} {{ m.title }}
Careers

Build the company, not just the shift.

AMG is early. The people who join now write the work instructions, choose the systems, and set the standard the next hundred people inherit.

Warehouse team

How we hire

Capability and values are both required. Neither substitutes for the other. Values are interviewed structurally — each of the five values has a behavioral question, and the answer either demonstrates the value or it doesn't.

Role definition Written before the role is posted
Screen Baseline qualification against written criteria
Functional Technical capability for the role
Values interview Behavioral evidence against the five values
Work sample Demonstrated ability in the actual work
Decision Documented, panel-based, with references verified

First 90 days

New employees are taught the method before they are taught the task. That sequence is what makes the standard hold as headcount grows.

Day 1 Systems, access, safety certification
Day 5 The AMG Way — method before task
Day 15 Role standard work documented
Day 20 Pulse role training complete
Day 30 First formal review
Day 90 Full proficiency check — method and output

Open roles

{{ r.title }} {{ r.team }} {{ r.location }}

Placeholder roles — replace with the live req list.

Contact

Send the spec. We'll send a straight answer.

Quotes are handled by a program manager, not a queue. Include part dimensions, annual usage, and your release pattern and we'll respond within two business days.

Quality documentation quality@alliedmeridiangroup.com
Main line [000] 000-0000

Request a quote

One partner for design, sourcing, storage, and distribution.